secrf.com

PROJECTS OF THE COMPANY

we have been working since 2007

Works performed:

Nassiryah TPS
Rehabilitation and repair of the Unit No.3. Repair of the boiler’s systems, Turbine & Turbine systems, LPRotor balancing, water intake system rehabilitation.

Year of work completed:

March-November 2022

Client:

Ministry of electricity of Iraq GCEEP South Region

Works performed:

Nassiryah TPS
Emergency maintenance of the Boiler No.1
Diagnostics, emergency repair of the boiler, metal structure, gas and air ducts, isolation.

Year of work completed:

April-September 2021

Client:

Ministry of electricity of Iraq GCEEP South Region

Works performed:

Beiji TPS
Diagnostics, management of boiler, turbine, chemical treatment and DCS maintenance using Russian and local experts. Fuel storages/tanks assembly.
Beiji TPS
Diagnostics, management of boiler, turbine, chemical treatment and DCS maintenance using Russian and local experts

Year of work completed:

2012 — 2013

Client:

Ministry of electricity of Iraq GDEEP Salah Al-Din

Works performed:

Construction of transmission line for Moscow energy Circle (line Gribovo-Dorohovo), 500 Kv, 50 Km

Year of work completed:

2012

Client:

Moscow Energy Company (MosEk) Moscow Energy Circle Project

Works performed:

Al-Musaib TPS
Diagnostics, management of boiler, turbine, chemical treatment and DCS maintenance using Russian and local experts. Repair of fuel tanks and storages.
Transmission line construction and rehabilitation of damage parts – 17 Km

Year of work completed:

2011 — 2012

Client:

Ministry of electricity of Iraq
GDEEP Middle Region

Works performed:

Rehabilitation of Units 3 & 4 of Nassiria TPS 2X180MW on turn-key basis boilers – 90% replacement; turbines –overhauling; generators – overhauling, auxiliaries –overhauling).
Special project for replacement of generators’ exciter system
Special project for 100% replacement of DCS (up to 4.000 signals for each Unit).
Metal structure erection and rehabilitation of water storage 10.000 m3/10 mm thickness and fuel and chemicals’ storages repair and rehabilitation up to 50.000m3.
Transmission line for national grid rehabilitation and maintenance – 23 Km.
Supply of equipment, spare parts and materials 2010

Year of work completed:

2009 — 2013

Client:

Ministry of electricity of Iraq GDEEP Nassiria

Works performed:

Rehabilitation and removing of turbine vibration in Unit 2 of Nassiria TPS

Year of work completed:

2010

Client:

Ministry of electricity of Iraq GDEEP Nassiria

Works performed:

TPS Daura, Iraq
Diagnostics, management of boiler, turbine, chemical treatment and DCS maintenance using of Russian and local experts
TPS Daura, Iraq
Diagnostics, management of boiler, turbine, chemical treatment and DCS maintenance using Russian and local experts.
Design and construction of fuel tanks.
Transmission line of 132/33 Kv construction and maintenance – 15 Km.

Year of work completed:

2009-2010
2011-2012

Client:

Ministry of electricity of Iraq GDEEP Middle Region

Works performed:

Pakistan Steel. TPP-TBS Preparation of project design, supervision of the project for rehabilitation of 165MW thermal power plant and turbo blower station (4X220 tons/hr. steam); Boiler (3X55MW); Turbo generators (3X220nm3/min); turbo blower machines, boiler control system; HFO storage tanks rehabilitation with metal thickness 10 mm.

Year of work completed:

2008 — 2009

Client:

Pakistan Karachi Bin Qasim

Works performed:

East Siberia. Major overhauling of boilers BKZ-640-140 PT; TPE-215; Turbine T-100; turbo generators 120MW

Year of work completed:

2008 — 2010

Client:

Russia, East Siberia, Irkutsk Region, Generating company

Works performed:

Construction of transmission line for Moscow energy Circle (line Belyi Rast-Zapadnaya), 500 Kv, 52 Km

Year of work completed:

2008

Client:

Moscow Energy Company (MosEk) Moscow Energy Circle Project

Works performed:

Construction of transmission line and rehabilitation of «Holstonkovo» substation of 35/10 Kv

Year of work completed:

2007

Client:

JSC Moscow United Grid Company

Works performed:

Construction of transmission line for Moscow energy Circle (line Noginsk- Chagino), 500 Kv, 73 Km.

Year of work completed:

2007 — 2008

Client:

Moscow Energy Company (MosEk) Moscow Energy Circle Project

Works performed:

Modernization of Ulan-Bator TPS-4 thermo power plant on turn-key basis

Year of work completed:

2007 — 2009

Client:

Ministry of electricity of Mongolia, Ulan-Bator Regional electricity department

Works performed:

Kaliningrad TPS of combine cycle. Kaliningrad Region, Russia. Transmission lines of 500Kv construction – 38 Km. Construction and rehabilitation of off-shore oil storages up to 50.000 m3.

Year of work completed:

2007 — 2009

Client:

Public joint stock company InterRAO (Russia)